FRENCH CEMETERY OF GAMMARTH in (October, 2010 – current)

After the realization of the watering system of the American Military Cemetery in Carthage, HYDRITEC SYSTEMS Company began the implementation of an automatic watering system on the French Military Cemetery in Gammarth.
Thanks to the will and the perspicacity of Mister ARROUY, Manager of the War veterans and War victims? Service in Tunis, this site, highly symbolic of the French State in Tunisia, is going to be able to benefit from a successful irrigating system so as to be allowed to protect its unique plant heritage.
This exceptional and surprising site is worth visiting, the point of view will take your breath away. HYDRITEC SYSTEMS company planned all the technical and human means to assure a perfect realization of its works by respecting this site steeped in history.
One more time, these works are a technical exploit by the delicacy of the intervening and the respect of places.
The company was granted the totality of the works, from the technical study until the turnkey realization.
The watering equipments will be RAIN BIRD marque, and the pumping station WPS (Water Pumping Systems).
The works also include a waterproofness of the storage water tank as well as the construction of a technical reserve.

Show the whole presentation

AMERICAN CEMETERY OF CARTHAGE
(from January 2009 to July 2009 – October 2010 current additional Works)

HYDRITEC SYSTEMS company certainly signed its most prestigious realization : the complete change of a dilapidated watering system by an ultramodern watering system managed by computer and piloted by a meteorological station.
It was a quasi-surgical operation through the quality and control of the works.
First of all, the site is a pure landscaped marvel where the interview of the green spaces is a real vocation at the sight of the rigor of work which is carried out there.
HYDRITEC SYSTEMS company mobilized its best staff to allow the work in such a particular place which imposes not only the respect but also the admiration.
The realized watering system is ultramodern:
All the parameters are checked and controlled by computer, Electric Connection by cable bus and decoders.
The management of the watering is achieved by meteorological station, The management of fountains and the control of the pumping station are computerized, the drillings and the Sonede automated, The communication is piloted by modem with telephone Gsm and radio.
In brief, the ultimate performance in technology of watering.
The equipments of used watering is TORO marquee and the pumping station with speed variation is of LOWARA marque.
HYDRITEC SYSTEMS company also restored completely 6 fountains of the site and took care of the works of civil engineering, the technical premises and the water storage tank.

Show the whole presentation

GOLF YASMINE HAMMAMET (June 2010 current Works)

Thanks to the impulse of its leaders, the Golf Yasmine began a real metamorphosis: creation of a new course of 18 holes and renovation of the existing course.
The architecture is signed Jack Niklaus (Top 5 of the golf courses world architects).
Therefore Tunisia is going to propose the second course with a prestigious signature, which will certainly raise the brand image of this destination.
The amount of the investments offers to this project the incomparable objectives in Tunisia.
The works of current architecture on the new 18 holes show an exceptional and very animated shaping which will positively surprise even the best golfers.
All the team of HYDRITEC SYSTEMS is very happy to be a member of this new project.
Having executed successfully the works of automatic watering system in the Golf of Gammarth in 2008, the company will have to raise one of its biggest technical challenges.
Effectively, the quality and the precision of the turfed zones require a very specific setting-up of labor.
All the courses will be equipped with watering equipments and pumping stations RAIN BIRD, thus the end of works of the 1st course is planned for June, 2011.

Show the whole presentation

AIRPORT ZINE EL ABIDINE BEN ALI in ENFIDHA (June, 2009 to January, 2010)

HYDRITEC SYSTEMS Company was entrusted the study and the turnkey realization of the automatic irrigating system concerning the green spaces of the New Tunisian International Airport.
The project is grand, a surface of 25 hectares of green spaces including approximately 5 hectares of lawn.
The various emphasized landscape themes help us discover, at the same time, desert, Mediterranean and tropical sceneries.
More than :
• 34000 kms of pipes ;
• 53000kms of Dripline ;
• 2500 sprinklers of every types ;
• 104 electric control valves ;
• 130 quick coupling valves ;
• 1 pumping station of 135 m3 / hour at 10 bars ;
• were necessary to realize the watering network ;
• More than 3,5 kms separate both extremities of the project ;
The irrigating equipments installed is RAIN IBRD Marque, in fact it is a decoder programming system.
The pumping station with speed variation is GRUNDFOS Marque.

Show the whole presentation